Robotics Education & Competition Foundation
Inspiring students, one robot at a time.

The Q&A is closed for the 2021-2022 season. Any rule changes or clarifications pertaining to the 2022 VEX Robotics World Championship will be included in the April 5 Game Manual Update. Teams attending VEX Worlds who wish to pre-submit questions for the driver's meeting should have received a contact form via email; if not, please contact your REC Foundation Team Engagement Manager for more information.

Official Q&A: VRC 2021-2022: Tipping Point

Usage Guidelines All Questions

874: Problems with the new Cortex rule in VRC due to V5 system backordered


18266A
1-Oct-2021

Background

We registered and activated an independent VRC team this season, but ran into some troubles. We bought an EDR super kit a few years ago before V5 was released, so the kit came with Cortex. New rules this season state that we are not allowed to use electronics from the Cortex system. I understand that VEX requires upgrade as technology advances and this will result in older versions to become obsolete. However, V5 EDR super kit, system bundle, and some separate electronics are backordered. I searched through the forum to see if other people encountered similar problems and this is what I found: https://www.vexforum.com/t/problems-with-the-new-cortex-rule/93623

            They ordered V5 products before September 24 and the product will not arrive before March 2022 for them, which basically the end of qualification season. We have already placed an order on V5 system bundle, but it is quite disappointing to learn the fact that there is a possibility we may not be eligible to participate in any competitions this season since there’s probably no way I can get necessary V5 electronics from VEX before the end of October.

Question

Is there any chance to allow Cortex for at least this year so VEX has more time to manufacture and ship V5, or is there anything we can do to get a V5 system bundle in time? Thanks.

R6  
Answered by committee

Is there any chance to allow Cortex for at least this year so VEX has more time to manufacture and ship V5, or is there anything we can do to get a V5 system bundle in time? Thanks.

There are no plans to change rule R6-b at this time. We would recommend contacting [email protected] or your REC Foundation Team Engagement Manager for assistance.